建筑专业:
1.将一层G区的儿童用房改为展厅;
2.在一层I区增加储藏间意大利语翻译;
3.将二层M区的多媒体室改为储藏间、更衣室、冰激凌室;
4.将二层G区厨房按意方提供的平面及设备布置进行相应的修改; 并去掉餐厅处的玻璃隔断; 另在m2轴的外墙内侧开设凹洞;
5.将二层F区咖啡厅的原厨房取消, 增加一个操作间;
6.在三层G区的VIP室增加一个茶水间;
7.在三层O区的电梯两侧增加两个放映室西班牙语翻译;
8.将三层B区的淋浴间减小, 并增加一个风机房;
1. Transform the children room of G zone on the 1st floor into exhibition room;
2. Add a storeroom in I zone on the 1st floor;
3. Transform the media room in M zone on 2nd floor into storeroom, dressing room and ice cream room;
4. Adjust the kitchen in G zone on 2nd floor according to the plane layout and facility location provided by Italy, remove the glass partition in dining-hall, dig a pit at the inner side of periphery wall around m2 axis;
5. Remove the kitchen of coffee house in F zone on 2nd floor to add a operating room;
6. Add a tea room in VIP room in G zone on 3rd floor;
7. Add two projection rooms at both side of elevator in O zone on 3rd floor;
8. Decrease the area of shower cubicle in B zone on the 3rd floor to add a fan room;